-
Federal
Discharge measurements collected downstream of Brandon Road Lock and Dam, Joliet, Illinois, USA in December 2014
Department of the Interior —
Flow discharges were measured in the Des Plaines River immediately downstream of the Brandon Road Lock at river mile 286 on December 9, 2014 a using Teledyne RDI Rio... -
Federal
Multibeam bathymetry and sediment depth data at select locations on the Des Plaines River near Joliet, Illinois, February 13–14, 2017
Department of the Interior —
These data are high-resolution bathymetry (river bottom elevation) in XYZ format and measurements of sediment depth in CSV format, generated from the February 13–14,... -
Federal
Velocity measurements collected in the lock chamber of Brandon Road Lock and Dam, Joliet, Illinois, USA in December 2014
Department of the Interior —
Water velocities were measured in the lock chamber of Brandon Road Lock on the Des Plaines River at river mile 286 on December 10, 2014 using a Teledyne RDI Rio... -
Federal
Multibeam bathymetry and sediment depth data at select locations on the Des Plaines River near Joliet, Illinois, February 13–14, 2017
Department of the Interior —
These data are measurements of sediment depth in the downstream approach channel of Brandon Rd Lock and Dam at Joliet, Illinois, on February 13-14, 2017. Data... -
Federal
Multibeam bathymetry and sediment depth data at select locations on the Des Plaines River near Joliet, Illinois, February 13–14, 2017
Department of the Interior —
These data are high-resolution bathymetry (river bottom elevation) in XYZ format, generated from the February 13, 2017, topographic and hydrographic survey of the Des... -
Federal
Modeled nutrient and sediment concentrations from the Des Plaines River at Route 53 at Joliet, Illinois, based on continuous monitoring from October 1, 2017, through September 30, 2020
Department of the Interior —
During the 2018–20 water years, the U.S. Geological Survey, in cooperation with the Metropolitan Water Reclamation District of Greater Chicago, operated a continuous... -
Federal
Bathymetric survey of Rock Run Rookery Lake, Will County, Illinois
Department of the Interior —
The bathymetric data set was collected in Rock Run on Dec. 10, 2015 by USGS ILWSC staff Clayton Bosch and Louis Pappas. The bathymetric data were collected with an RD... -
Federal
Geophone Data from Brandon Road Lock and Dam, (2014)
Department of the Interior —
The data collection for the concrete-walled channel downstream from the Brandon Road Lock and Dam near Joliet, Illinois occurred in May 2014 Five pounds per square... -
Federal
Acoustic Doppler current profiler velocity and discharge measurements collected in and near the lock chamber of Brandon Road Lock and Dam, Joliet, Illinois, USA in December 2014
Department of the Interior —
Water velocities and discharge were measured in the lock chamber and immediately downstream of Brandon Road Lock on the Des Plaines River at river mile 286 on... -
Federal
Hydrophone Data from Brandon Road Lock and Dam, (2014)
Department of the Interior —
The data collection for the concrete-walled channel downstream from the Brandon Road Lock and Dam near Joliet, Illinois occurred in May 2014 Five pounds per square... -
Federal
LopheliaII2012: Coral Research on Oil Rigs in the Gulf of Mexico on TDI-Brooks Vessel Brooks McCall between 2012-07-12 and 2012-07-24
National Oceanic and Atmospheric Administration, Department of Commerce —
The final year of a multi-year effort to study Lophelia coral communities in the Gulf of Mexico is occurring on the TDI-Brooks research vessel, Brooks McCall, between... -
Federal
Multibeam bathymetry and sediment depth data at select locations on the Des Plaines River near Joliet, Illinois, February 13–14, 2017
Department of the Interior —
These data are high-resolution bathymetry (river bottom elevation) in XYZ format, generated from the February 14, 2017, topographic and hydrographic survey of the Des... -
Federal
Multibeam bathymetry and sediment depth data at select locations on the Des Plaines River near Joliet, Illinois, February 13–14, 2017
Department of the Interior —
These data are high-resolution bathymetry (river bottom elevation) in XYZ format, generated from the February 14, 2017, topographic and hydrographic survey of the Des... -
Federal
Acceleration Data from Brandon Road Lock and Dam, (2014)
Department of the Interior —
The data collection for the concrete-walled channel downstream from the Brandon Road Lock and Dam near Joliet, Illinois occurred in May 2014 Five pounds per square...