Federal
DEPRECATED. SEE UPDATE LINK BELOW. Distribution System Upgrade Unit Cost Database
Department of Energy —
REVISED 1/2/2019. SEE UPDATE LINK BELOW. This database contains unit cost information for different components that may be used to integrate distributed photovotaic... -
City
LADWP Solar Interconnection Time
City of Los Angeles —
The average amount of days to interconnect solar panels -
Federal
2019 Distribution System Upgrade Unit Cost Database Current Version
Department of Energy —
IMPORTANT NOTE: This is the current version of NREL's Distribution System Unit cost Database and should be considered the most up-to-date. Compared to the previous... -
Federal
Utility-Scale Solar, 2021 Edition: Analysis of Empirical Plant-level Data from U.S. Ground-mounted PV, PV+battery, and CSP Plants (exceeding 5 MWAC)
Department of Energy —
Berkeley Labs "Utility-Scale Solar", 2021 Edition presents analysis of empirical plant-level data from the U.S. fleet of ground-mounted photovoltaic (PV), PV+battery,...