-
Federal
Specified System Requirements for the HydroAir Power Take Off System
Department of Energy —
Includes Annual Energy Production of the system, Target Availability of the system, the system's PWR (power to weight ratio), Critical Dimensions and Weights (e.g.... -
Federal
Hydrokinetic Canal Measurements: Inflow Velocity, Wake Flow Velocity, and Turbulence
Department of Energy —
The dataset consist of acoustic Doppler current profiler (ADCP) velocity measurements in the wake of a 3-meter diameter vertical-axis hydrokinetic turbine deployed in... -
Owner Lot Line Dimensions
District of Columbia —
The dataset contains locations and attributes of owner lines with dimensions. The tax information (attribution) comes from the Office of Tax and Revenue's Public... -
Federal
Translated System Requirements into PTO Design Requirements (in addition to Component-level metrics) for the HydroAir Power Take Off System
Department of Energy —
Includes Maximum Cost, Critical Dimensions and Weights, Damping Curve, Rotor Speed Profile Changes, Mechanical Power for a given pressure and airflow, Turbine rpm...