-
Federal
Advanced Control Systems for Wave Energy Converters
Department of Energy —
This submission contains several papers, a final report, descriptions of a theoretical framework for two types of control systems, and descriptions of eight real-time... -
Federal
Wave Tank Testing Report for Controls Validation of a Heaving Point Absorber
Department of Energy —
The core objectives of this project is to improve the power capture of three different wave energy conversion (WEC) devices by more than 50% using an advanced control... -
Federal
WEC Controls Optimization Final Report
Department of Energy —
The over-arching project objective is to fully develop and validate optimal controls frameworks that can subsequently be applied widely to different WEC devices and...