-
Federal
Azura Advanced Controls 1/15th Scale Wave Tank Testing
Department of Energy —
Experimental data from the wave tank test of the Advanced control systems developed by Northwest Energy Innovations (NWEI) for the Azura at the University of Maine in... -
Federal
Triton-C WEC Installation, Operations and Maintenance Plan (DDP)
Department of Energy —
This is the Installation, Operations and Maintenance (IO&M) Plan for the Triton-C WEC based on the Detailed System Design Package (DDP), including a report and... -
Federal
Utah FORGE 3-2417: Pulsed Interference Tests at Wells 16A(78)-32 and 16B(78)-32 - September 2024
Department of Energy —
This archive contains data and a report from Pulse Interference Tests (PITs), which were conducted on September 4, 2024, immediately following a 30-day recirculation... -
Federal
Hydraulic Studies of Drilling Microbores with Supercritical Steam, Nitrogen and Carbon Dioxide
Department of Energy —
Hydraulic studies of drilling micropores at various depths and with various hole sizes, tubing, fluids and rates to show theoretical feasibility. WELLFLO Simulations... -
Federal
Triton-C WEC Fabrication Plan (DDP)
Department of Energy —
This is the Fabrication Plan for the Triton-C WEC based on the Detailed System Design Package (DDP), including a report and visuals pertaining to the overall detailed...