-
Federal
October 2022 Probable Maximum 24-Month Study
Department of the Interior —
The Probable Maximum 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming... -
Federal
October 2014 Probable Minimum 24-Month Study
Department of the Interior —
The Probable Minimum 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming... -
Federal
April 2025 Most Probable 24-Month Study
Department of the Interior —
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge,... -
Federal
Colorado River At River Section 41 Daily Stream Gage Height-ft Time Series Data
Department of the Interior —
Data are from the Lower Colorado Hydrologic Database and updated once daily. -
Federal
April 2002 Most Probable 24-Month Study
Department of the Interior —
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge,... -
Federal
May 2008 Most Probable 24-Month Study
Department of the Interior —
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge,... -
Federal
February 2022 Most Probable 24-Month Study
Department of the Interior —
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge,... -
Federal
April 2015 Most Probable 24-Month Study
Department of the Interior —
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge,... -
Federal
Lake Mead Hoover Dam and Powerplant Daily Lake/Reservoir Release - Total-cfs Time Series Data
Department of the Interior —
Data are from the Lower Colorado Hydrologic Database and updated once daily. -
Federal
April 2021 Probable Minimum 24-Month Study
Department of the Interior —
The Probable Minimum 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming... -
Federal
May 2022 Probable Minimum 24-Month Study
Department of the Interior —
The Probable Minimum 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming... -
Federal
September 2019 Most Probable 24-Month Study
Department of the Interior —
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge,... -
Federal
January 2022 Probable Maximum 24-Month Study
Department of the Interior —
The Probable Maximum 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming... -
Federal
February 2025 Most Probable 24-Month Study
Department of the Interior —
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge,... -
Federal
Lake Havasu Parker Dam and Powerplant Daily Lake/Reservoir Elevation-ft Time Series Data
Department of the Interior —
Data are from the Lower Colorado Hydrologic Database and updated once daily. -
Federal
September 2009 Most Probable 24-Month Study
Department of the Interior —
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge,... -
Federal
June 2009 Most Probable 24-Month Study
Department of the Interior —
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge,... -
Federal
August 2024 Most Probable 24-Month Study
Department of the Interior —
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge,... -
Federal
August 2015 Probable Minimum 24-Month Study
Department of the Interior —
The Probable Minimum 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming... -
Federal
September 2004 Most Probable 24-Month Study
Department of the Interior —
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge,...