Skip to main content
U.S. flag

An official website of the United States government

Return to search results

WEC Controls Optimization Final Report

Published by Re Vision Consulting | Department of Energy | Catalog Last Checked: March 23, 2026 at 09:42 PM | Dataset Last Updated: July 28, 2021 at 04:30 PM
The over-arching project objective is to fully develop and validate optimal controls frameworks that can subsequently be applied widely to different WEC devices and concepts. Optimal controls of WEC devices represent a fundamental building block for WEC designers that must be considered as an integral part of every stage of device development. Using a building-blocks approach to optimal controls development, this effort will result in the full development of a feed-forward and feed-back control approach and a wave prediction system. Phase I focused primarily on numerical offline optimization and validation using wave tank testing of three industry partners? WEC devices, including CalWave, Ocean Energy, and Resolute Marine Energy. These industry partnerships allowed us to identify optimal control strategies for these different WEC topologies at different maturity levels. Phase II focused on demonstrating an integrated control system on a custom-built prototype for at-sea testing. A secondary focus during phase II is to adapt our systems identification, controls and wave-prediction frameworks to become more robust and comprehensive in respect to capability, robustness, and reliability. RE Vision Consulting leads this project and has compiled the final public domain report included in this submission.

Resources

1 resource available

  • Controls Optimization Final Technical Report.pdf

    PDF

Find Related Datasets

data.gov

An official website of the GSA's Technology Transformation Services

Looking for U.S. government information and services?
Visit USA.gov