Wave Tank Testing Report for Controls Validation of a Heaving Point Absorber

Published by Re Vision Consulting | Department of Energy | Catalog Last Checked: August 03, 2026 at 01:03 AM | Dataset Last Updated: May 17, 2021 at 04:24 PM
The core objectives of this project is to improve the power capture of three different wave energy conversion (WEC) devices by more than 50% using an advanced control system and validate the attained improvements using wave tank and full scale testing. In parallel, we will bring along the development of a wave prediction system that is required to enable effective control and test it at full scale. The purposes of this report are to: 1. Plan and document the 1/25th scale device testing at the wave-tank facility; 2. Document the test article, setup and methodology, sensor and instrumentation, mooring, electronics, wiring, and data flow and quality assurance; 3. Communicate the testing results between the associated members; 4. Facilitate reviews that will help to ensure all aspects (risk, safety, testing procedures, etc.); 5. Provide a systematic guide to setting up, executing and decommissioning the experiment.

Resources

3 resources available

Find Related Datasets

data.gov

An official website of the GSA's Technology Transformation Services

Looking for U.S. government information and services?
Visit USA.gov