Skip to main content
U.S. flag

An official website of the United States government

S&T Project 22017 Final Report: Methods to Mitigate and Remove Debris from Dam Intake Structures

Published by Bureau of Reclamation | Department of the Interior | Catalog Last Checked: October 25, 2026 at 12:42 AM | Dataset Last Updated: October 23, 2026 at 06:47 PM
Increasing debris loads at dam intake structures pose significant hydraulic, operational, and safety challenges for Reclamation facilities. The purpose of this project was to investigate existing, new, and emerging technologies that may be used to mitigate and/or remove debris at dam intake structures. A three-phase approach was used: 1) screening emerging technologies identified through Reclamation’s Science and Technology Prize Competition, 2) conducting physical hydraulic modeling of two selected concepts—the enhanced log boom and a self-cleaning trashrack—at the Black Canyon Dam, and 3) performing economic lifecycle cost analyses for both alternatives. Ultimately, optimal debris mitigation depends on debris type, hydraulic impacts, O&M requirements, and available funding, with all alternatives still requiring regular debris management.

Resources

2 resources available

  • RISE Item Details Page URL for "S&T Project 22017 Final Report: Methods to Mitigate and Remove Debris from Dam Intake Structures"

    HTML
  • PDF File for "S&T Project 22017 Final Report: Methods to Mitigate and Remove Debris from Dam Intake Structures"

    PDF

Find Related Datasets

Search by Tags

Click any tag below to search for similar datasets

data.gov

An official website of the GSA's Technology Transformation Services

Looking for U.S. government information and services?
Visit USA.gov