Skip to main content
U.S. flag

An official website of the United States government

S&T Project 20102 Final Report: Debris Clogging Assessment at Dams

Published by Bureau of Reclamation | Department of the Interior | Catalog Last Checked: August 01, 2026 at 05:30 AM | Dataset Last Updated: October 05, 2020 at 11:34 PM
Information was collected on debris clogging and debris management of spillway and outlet works structures at various Bureau of Reclamation (Reclamation) dams to identify data trends and key research needs. A short survey was sent to each Reclamation Area Office for information on debris occurrence, debris type and size, location of debris accumulation, interaction of sediment with debris, cost of debris management, and mitigation and monitoring techniques. Survey responses were also received for various facilities from Tennessee Valley Authority and Federal Energy Regulatory Commission. Reclamation results show that excessive debris occurs during flood events at 70% of reported facilities and during normal operations at 22% of reported facilities. Debris typically arrives during the beginning of high flows events such as spring runoff or heavy rain events and often during spring months. Burn events and extreme hydrological events often contribute to excessive debris. Debris loads consist most frequently of deadfall trees (88%) and vegetative debris (65%) with 78% of facilities reporting debris in the medium to small size range. Submerged debris typically starts as surface debris and then sinks rather than moving through the reservoir along the bed. Once debris is no longer floating, its eventual fate is largely unknown. Twenty-two percent of Reclamation respondents indicated that a facility currently has notable issues with sediment impacting outlet structures. Large debris removal is typically conducted physically by crane for debris near the dam or saw-cutting and hand removal for debris deposited on rip rap or banks. Debris management costs are generally 5-10% of operating and maintenance budgets, but direct and indirect costs can become very high when an urgent issue is detected.

Resources

2 resources available

  • RISE Item Details Page URL for "S&T Project 20102 Final Report: Debris Clogging Assessment at Dams"

    TEXT/HTML
  • PDF File for "S&T Project 20102 Final Report: Debris Clogging Assessment at Dams"

    APPLICATION/PDF

Find Related Datasets

Search by Tags

Click any tag below to search for similar datasets

data.gov

An official website of the GSA's Technology Transformation Services

Looking for U.S. government information and services?
Visit USA.gov