S&T Project 20024 Grand Coulee Interim Report: Nathaniel “Nat” Washington Power Plant G21 Turbine Runner Cavitation Resistant Coating Field Trial
Resources
2 resources available
-
RISE Item Details Page URL for "S&T Project 20024 Grand Coulee Interim Report: Nathaniel “Nat” Washington Power Plant G21 Turbine Runner Cavitation Resistant Coating Field Trial"
TEXT/HTML -
PDF File for "S&T Project 20024 Grand Coulee Interim Report: Nathaniel “Nat” Washington Power Plant G21 Turbine Runner Cavitation Resistant Coating Field Trial"
APPLICATION/PDF
Find Related Datasets
Search by Tags
Click any tag below to search for similar datasets
Complete Metadata
| @type | dcat:Dataset |
|---|---|
| accessLevel | public |
| accrualPeriodicity | irregular |
| bureauCode |
[ "010:10" ] |
| contactPoint |
{ "fn": "RISE Team", "@type": "vcard:Contact", "hasEmail": "mailto:data@usbr.gov" } |
| description | Cavitation resistant coatings have been used in mild cavitation conditions with mixed results, and rarely lasted more than a few years before needing repair. Laboratory testing identified two commercial polyurethane elastomers with better cavitation resistance than prior coatings used in draft tubes for cavitation resistance. These two elastomers, PE1 and PE2, were selected for field trials on Nathaniel “Nat” Washington Power Plant Unit G21 turbine runner, a severe cavitation environment in which stainless steel weld overlays require repairs of pitting damage on a three-year rotation. The goal of the field trial is to determine if the elastomers can reduce stainless steel cavitation in a severe cavitation environment to lengthen the repair cycle and reduce cost. This interim report documents the surface preparation and coating of Blades 7 and 13 with PE2 and PE1, respectively. |
| distribution |
[ { "@type": "dcat:Distribution", "title": "RISE Item Details Page URL for "S&T Project 20024 Grand Coulee Interim Report: Nathaniel “Nat” Washington Power Plant G21 Turbine Runner Cavitation Resistant Coating Field Trial"", "accessURL": "https://data.usbr.gov/catalog/8001/item/128577", "mediaType": "text/html", "description": "Landing page for "S&T Project 20024 Grand Coulee Interim Report: Nathaniel “Nat” Washington Power Plant G21 Turbine Runner Cavitation Resistant Coating Field Trial"" }, { "@type": "dcat:Distribution", "title": "PDF File for "S&T Project 20024 Grand Coulee Interim Report: Nathaniel “Nat” Washington Power Plant G21 Turbine Runner Cavitation Resistant Coating Field Trial"", "mediaType": "application/pdf", "description": ""S&T Project 20024 Grand Coulee Interim Report: Nathaniel “Nat” Washington Power Plant G21 Turbine Runner Cavitation Resistant Coating Field Trial" as a PDF file", "downloadURL": "https://data.usbr.gov/rise/content-rise-public/rise/catalog-item/binary/8540-2023-12%20Grand%20Coulee%20G21%20Cavitation%20Field%20Trial.pdf" } ] |
| identifier | https://datainventory.usbr.gov/rise/item/128577 |
| keyword |
[ "Cavitation", "Ceramic-filled Epoxy", "Coatings", "Cold Spray", "Polyurethane Elastomer" ] |
| landingPage | https://data.usbr.gov/catalog/8001/item/128577 |
| modified | 2024-01-04T19:59:03Z |
| publisher |
{ "name": "Bureau of Reclamation", "@type": "org:Organization" } |
| spatial |
"{"type":"Polygon","coordinates":[[[-124.508,48.197],[-124.304,40.096],[-117.02,32.608],[-103.405,29.136],[-93.466,30.77],[-94.692,38.939],[-97.279,48.946],[-122.67,48.946],[-124.508,48.197]]]}"
|
| title | S&T Project 20024 Grand Coulee Interim Report: Nathaniel “Nat” Washington Power Plant G21 Turbine Runner Cavitation Resistant Coating Field Trial |