S&T Project 19188 Interim Report: Guide for Recoating and Relining Penstocks and Discharge Tubes
Resources
2 resources available
-
RISE Item Details Page URL for "S&T Project 19188 Interim Report: Guide for Recoating and Relining Penstocks and Discharge Tubes"
TEXT/HTML -
PDF File for "S&T Project 19188 Interim Report: Guide for Recoating and Relining Penstocks and Discharge Tubes"
APPLICATION/PDF
Find Related Datasets
Search by Tags
Click any tag below to search for similar datasets
Complete Metadata
| @type | dcat:Dataset |
|---|---|
| accessLevel | public |
| accrualPeriodicity | irregular |
| bureauCode |
[ "010:10" ] |
| contactPoint |
{ "fn": "RISE Team", "@type": "vcard:Contact", "hasEmail": "mailto:data@usbr.gov" } |
| description | Reclamation’s assets are aging—most are over 60 years old and the original coatings and linings are at varying stages of degradation. This guide is for recoating or relining projects for penstocks, discharge tubes, or similar infrastructure. Coatings and linings are the primary means for providing corrosion protection. A few penstocks have already been recoated or relined since original construction at Reclamation. The knowledge and experience gained from these projects provide the foundation for this guide. In addition, communication with other agencies regarding their projects has provided additional guidance and experiences to contribute to this guide. |
| distribution |
[ { "@type": "dcat:Distribution", "title": "RISE Item Details Page URL for "S&T Project 19188 Interim Report: Guide for Recoating and Relining Penstocks and Discharge Tubes"", "accessURL": "https://data.usbr.gov/catalog/4635/item/11502", "mediaType": "text/html", "description": "Landing page for "S&T Project 19188 Interim Report: Guide for Recoating and Relining Penstocks and Discharge Tubes"" }, { "@type": "dcat:Distribution", "title": "PDF File for "S&T Project 19188 Interim Report: Guide for Recoating and Relining Penstocks and Discharge Tubes"", "mediaType": "application/pdf", "description": ""S&T Project 19188 Interim Report: Guide for Recoating and Relining Penstocks and Discharge Tubes" as a PDF file", "downloadURL": "https://data.usbr.gov/rise/content-rise-public/rise/catalog-item/binary/Coatings%20and%20Linings%20Selction%20Guide%20Final%207-6-21%20%281%29.pdf" } ] |
| identifier | https://datainventory.usbr.gov/rise/item/11502 |
| keyword |
[ "Coatings", "Corrosion Protection", "Robotics" ] |
| landingPage | https://data.usbr.gov/catalog/4635/item/11502 |
| modified | 2021-11-03T19:19:19Z |
| publisher |
{ "name": "Bureau of Reclamation", "@type": "org:Organization" } |
| spatial |
"{"type":"Polygon","coordinates":[[[-180,-90],[-180,90],[180,90],[180,-90],[-180,-90]]]}"
|
| title | S&T Project 19188 Interim Report: Guide for Recoating and Relining Penstocks and Discharge Tubes |