Skip to main content
U.S. flag

An official website of the United States government

NEVI 2 Corridor Groups (October 28 2025)

Published by California Energy Commission | State of California | Catalog Last Checked: November 28, 2025 at 07:18 PM | Dataset Last Updated: October 28, 2025 at 06:13 PM
California-designated corridors are grouped by location and number of new charging stations required under NEVI. Data Dictionary:Corridor Segment - A portion of a highway corridor.Corridor Group - A group of one or more corridor segments.  Alternative Fuel Corridor - The U.S. Department of Transportation Federal Highway Administration (FHWA) designates a national network of plug-in electric vehicle (EV) charging and hydrogen, propane, and natural gas fueling infrastructure along national highway system corridors. To designate these Alternative Fuel Corridors (AFC), FHWA solicits nominations from state and local officials and works with other federal officials and industry stakeholders.Minimum Charging Stations Required - The minimum number of charging stations a corridor segment must have to be eligible for funding for Round 2 of California’s NEVI program solicitation. Minimum Ports Required - The minimum number of new ports a corridor segment must have to be eligible for funding for Round 2 of California’s NEVI program solicitation.Needed Locations - Locations where charging stations need to be sited to ensure the NEVI 50-mile station placement requirement is met for all routes of travel from one AFC to another, if applicable.

Resources

11 resources available

Find Related Datasets

data.gov

An official website of the GSA's Technology Transformation Services

Looking for U.S. government information and services?
Visit USA.gov