Forecasted EV Charging Infrastructure Gap (Dataset)
Resources
6 resources available
-
CSV
CSV -
GeoJSON
GEOJSON -
KML
KML -
Shapefile
ZIP -
ArcGIS Hub Dataset
WEB -
ArcGIS GeoService
REST
Find Related Datasets
Search by Tags
Click any tag below to search for similar datasets
Complete Metadata
| @type | dcat:Dataset |
|---|---|
| accessLevel | public |
| contactPoint |
{ "fn": "TempeData", "@type": "vcard:Contact", "hasEmail": "mailto:data@tempe.gov" } |
| description | <p>This feature layer provides counts of forecasted chargers needed and current gap in charging for census tracts in Tempe. Each record represents a census tract in Tempe and includes details on forecasted charger count, existing charger, and gap in chargers at level 2 and DC Fast charging power levels.</p><p>This modeled dataset was created by Catalyst Mobility (formerly Calstart). This information is a component of ongoing efforts for EV charging infrastructure development for Tempe.</p><p style='background-color:white; line-height:130%; margin-bottom:0in;'><span style='color:black;'><strong>Data Scope</strong> </span></p><p style='background-color:white; line-height:130%; margin-bottom:0in;'><span style='color:black;'><i>Charger forecasts are to 2050 for level 2 and DC fast charging power levels.</i></span></p><p style='background-color:white; line-height:130%; margin-bottom:0in;'> </p><p style='background-color:white; line-height:130%; margin-bottom:0in;'><span style='color:black;'><strong>Data Use</strong> </span></p><p style='background-color:white; line-height:130%; margin-bottom:0in;'><span style='color:black;'><i>Intended to be used in the Tempe EVCI Development Strategy Map.</i></span><br /><span style='color:black;'><i><span> </span></i></span></p><p style='background-color:white; line-height:130%; margin-bottom:0in;'><span style='color:black;'><strong>Data Limitations</strong> </span></p><p style='background-color:white; line-height:130%; margin-bottom:0in;'>Charger count data is forecasted and may not reflect actual future conditions.</p><p style='background-color:white; line-height:130%; margin-bottom:0in;'> </p><p style='background-color:white; line-height:130%; margin-bottom:0in;'><a target='_blank' href='https://tempe.gitbook.io/data-dictionary/environment-and-sustainability/electric-vehicle-charging-infrastructure-evci-data-dictionary/forecasted-ev-charging-infrastructure-gap' rel='nofollow ugc noopener noreferrer'><span style='font-size:18px;'><strong>Data Dictionary</strong></span></a></p><p style='background-color:white; line-height:130%; margin-bottom:0in;'> </p><p><span style='font-size:18px;'><strong>Additional Information</strong></span></p><p><strong>Contact Name: </strong>Sustainability Division</p><p><strong>Contact Email:</strong> <a href='mailto:sustainability@tempe.gov' rel='nofollow ugc'>sustainability@tempe.gov</a></p><p><strong>Data Source:</strong> <br />Catalyst Mobility (formerly Calstart)</p><p><strong>Data Source Type:</strong> <br />GIS Feature Layer </p><p><strong>Preparation Method:</strong> <br /><i>See Task 2 of</i><a target='_blank' href='https://to be published' rel='nofollow ugc noopener noreferrer'><i> Electric Vehicle Charging Infrastructure (EVCI) Siting Plan Assessment</i></a></p><p><strong>Publish Method:</strong> <br />Manual</p><p><strong>Publish Frequency:</strong> <br /><i>One-time static</i></p> |
| distribution |
[ { "@type": "dcat:Distribution", "title": "CSV", "format": "CSV", "accessURL": "https://data.tempe.gov/api/download/v1/items/350b98c8d9334bf19445877666bfea15/csv?layers=0", "mediaType": "text/csv" }, { "@type": "dcat:Distribution", "title": "GeoJSON", "format": "GeoJSON", "accessURL": "https://data.tempe.gov/api/download/v1/items/350b98c8d9334bf19445877666bfea15/geojson?layers=0", "mediaType": "application/vnd.geo+json" }, { "@type": "dcat:Distribution", "title": "KML", "format": "KML", "accessURL": "https://data.tempe.gov/api/download/v1/items/350b98c8d9334bf19445877666bfea15/kml?layers=0", "mediaType": "application/vnd.google-earth.kml+xml" }, { "@type": "dcat:Distribution", "title": "Shapefile", "format": "ZIP", "accessURL": "https://data.tempe.gov/api/download/v1/items/350b98c8d9334bf19445877666bfea15/shapefile?layers=0", "mediaType": "application/zip" }, { "@type": "dcat:Distribution", "title": "ArcGIS Hub Dataset", "format": "Web Page", "accessURL": "https://data.tempe.gov/datasets/tempegov::forecasted-ev-charging-infrastructure-gap-dataset", "mediaType": "text/html" }, { "@type": "dcat:Distribution", "title": "ArcGIS GeoService", "format": "ArcGIS GeoServices REST API", "accessURL": "https://services.arcgis.com/lQySeXwbBg53XWDi/arcgis/rest/services/Tempe%20EVCI%20Gap%20Lv%202%20and%20DCFC/FeatureServer/0", "mediaType": "application/json" } ] |
| identifier | https://www.arcgis.com/home/item.html?id=350b98c8d9334bf19445877666bfea15&sublayer=0 |
| issued | 2026-05-11T21:14:57.000Z |
| keyword |
[ "Charging Demand", "EV", "Electric Vehicle Chargers", "Electric Vehicle Charging Infrastructure", "Tempe EVCI" ] |
| landingPage | https://data.tempe.gov/datasets/tempegov::forecasted-ev-charging-infrastructure-gap-dataset |
| license | https://creativecommons.org/licenses/by/4.0 |
| modified | 2026-07-13T20:23:39.952Z |
| publisher |
{ "name": "City of Tempe" } |
| spatial | -111.9785,33.3200,-111.8774,33.4646 |
| theme |
[ "geospatial" ] |
| title | Forecasted EV Charging Infrastructure Gap (Dataset) |