Skip to main content
U.S. flag

An official website of the United States government

Adaptive Sediment Management Program Final Report for the Elwha River Restoration Project

Published by Bureau of Reclamation | Department of the Interior | Catalog Last Checked: September 10, 2026 at 07:44 PM | Dataset Last Updated: November 19, 2025 at 09:08 PM
This technical report documents final results from six years of an interagency, adaptive sediment management program for the removal of Elwha and Glines Canyon dams including: (1) physical changes to the reservoirs and downstream river channel resulting from dam removal, (2) effects of dam removal on downstream water quality (sediment loads) and flood stage, (3) dam removal and reservoir drawdown methods (Appendix A), (4) modeling accomplished to support the EIS and adaptive management program (Appendix B), (5) dam operational effects on downstream discharge prior to dam removal (Appendix C), and (6) a literature review on potential effects of dam removal on the City of Port Angeles Ranney Well (Appendix D).

Resources

2 resources available

  • RISE Item Details Page URL for "Adaptive Sediment Management Program Final Report for the Elwha River Restoration Project"

    HTML
  • PDF File for "Adaptive Sediment Management Program Final Report for the Elwha River Restoration Project"

    PDF

Find Related Datasets

Search by Tags

Click any tag below to search for similar datasets

data.gov

An official website of the GSA's Technology Transformation Services

Looking for U.S. government information and services?
Visit USA.gov