-
Federal
Utah FORGE Project 3-2417: Well 16B(78)-32 Fiber-Optic Cable Installation Report recent views
Department of Energy —
This is an installation report detailing placement of the integrated fiber-optic cable behind casing in Utah FORGE well 16B(78)-32. These activities occurred in July... -
Federal
Advanced TidGen Power System - Preliminary IO&M and Testing Plan recent views
Department of Energy —
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power... -
Federal
Advanced TidGen Power System - Summary Presentation recent views
Department of Energy —
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power... -
Federal
Oscylator-4 Energy Converter St. Clair River Installation Data 2016 recent views
Department of Energy —
Data collected during the 2016 St. Clair River installation of the Oscylator-4 energy converter. -
Federal
Advanced TidGen Power System - ORPC Public Technical Report, Device Design recent views
Department of Energy —
Technical report for public dissemination on the design progress for the Advanced TidGen(R) Power System. -
Federal
TidGen: Permits for Installation of Single Turbine Test System, Cobscook Bay, Maine recent views
Department of Energy —
This is a summary of permits required and obtained for installation, operation, removal of the TidGen Single Turbine Test system in Cobscook Bay, May in 2023. The...