-
Federal
HERO WEC V1.0 2024 - WEC-Sim Detailed Simulation Runs and Summary Data recent views
Department of Energy —
This dataset includes results from simulations of NREL's hydraulic and electric reverse osmosis wave energy converter (HEREO WEC). Simulation runs include 135 wave... -
Federal
Aquantis 2.5 MW Ocean Current Generation Device Design Details recent views
Department of Energy —
Items in this submission provide the detailed design of the Aquantis Ocean Current Turbine and accompanying analysis documents, including preliminary designs,... -
Federal
MHK Levelized Cost of Energy (LCOE) Guidance and Techo Economic Analysis Materials recent views
Department of Energy —
Useful information and tools for calculating the Levelized Cost of Energy (LCOE) and MHK Cost Breakdown Structure. Includes a structure for calculating the capital... -
Federal
TriFrame Mount Structural Performance - Period A recent views
Department of Energy —
Long-Term TriFrame Monitoring System (LTTFMS) data collected during Period A (13 days - 10/22/20 - 11/4/20). The central component of the Verdant Power Free Flow... -
Federal
Kvichak River RISEC Project Resource Reconnaissance and Physical Characterization, Igiugig, AK recent views
Department of Energy —
During the summer and fall of 2011 TerraSond Ltd. (TerraSond) completed a bathymetric survey and hydrokinetic energy assessment of the Kvichak River at Igiugig,... -
Federal
Reference Model 5 Cost Breakdown (RM5: Oscillating Surge Flap) recent views
Department of Energy —
Contains the Reference Model 5 (RM5) spreadsheets with the cost breakdown structure (CBS) for the levelized cost of energy (LCOE) calculations for a single RM5 device... -
Federal
Wave Tank Testing Report for Controls Validation of a Heaving Point Absorber recent views
Department of Energy —
The core objectives of this project is to improve the power capture of three different wave energy conversion (WEC) devices by more than 50% using an advanced control... -
Federal
Advanced WEC Dynamics and Controls, Test 1 recent views
Department of Energy —
Numerous studies have shown that advanced control of a wave energy converter's (WEC's) power take off (PTO) can provide significant increases (on the order of... -
Federal
Reference Model 1 Cost Breakdown (RM1: Tidal Current Turbine) recent views
Department of Energy —
Contains the Reference Model 1 (RM1) spreadsheets with the cost breakdown structure (CBS) for the levelized cost of energy (LCOE) calculations for a single RM1 device... -
Federal
Centipod WEC, Advanced Controls, Baseline LCOE recent views
Department of Energy —
Project baseline levelized cost of energy (LCOE) model for the Centipod WEC containing annual energy production (AEP) data, a cost breakdown structure (CBS), model... -
Federal
Net Shape Fabricated Low Cost MHK Pass-Through the Hub Turbine Blades with Integrated Health Management Technology recent views
Department of Energy —
The primary objective of this project is to develop a three-blade MHK rotor with low manufacturing and maintenance costs. The proposed program will design, fabricate... -
Federal
Development of Classification Systems for Wave Energy Resources and WEC Technologies recent views
Department of Energy —
The submission includes wave resource classification reports, summary of classification statistics and regional trends, and data files with classification statistics... -
Federal
StingRAY Failure Mode, Effects and Criticality Analysis: WEC Risk Registers recent views
Department of Energy —
Analysis method to systematically identify all potential failure modes and their effects on the Stingray WEC system. This analysis is incorporated early in the... -
Federal
Aquantis 2.5 MW Ocean Current Generation Device - Tow Tank Dynamic Test Rig Drawings and Bill of Materials recent views
Department of Energy —
Aquantis 2.5 MW Ocean Current Generation Device, Tow Tank Dynamic Test Rig Drawings and Bill of Materials. This submission contains information on the equipment for... -
Federal
Aquantis 2.5 MW Ocean Current Generation Device - Scaled Tank Test Design and Results recent views
Department of Energy —
Aquantis 2.5 MW Ocean Current Generation Device, Tow Tank Dynamic Rig Structural Analysis Results. This is the detailed documentation for scaled device testing in a... -
Federal
StingRAY WEC Risk Register recent views
Department of Energy —
Risk Registers for major subsystems of the StingRAY WEC completed in compliance with the DOE Risk Management Framework developed by NREL. -
Federal
Wave Energy Prize Wave Calibration Data for the 1:20 Scale Testing at MASK recent views
Department of Energy —
Time series data, sensor layout, and wave calibration summaries for the wave height measurements for the 10 calibration sea states for the 1:20 scale testing of the... -
Federal
LCOE and Baseline Data for ORPC's RivGen 1.F River Power System recent views
Department of Energy —
Base data and documentation of LCOE calculations for ORPC's RivGen 1.F Power System, demonstrated in the Kvichak River at Igiugig, Alaska in 2015.