StingRAY WEC Risk Register recent views
Department of Energy —
Risk Registers for major subsystems of the StingRAY WEC completed in compliance with the DOE Risk Management Framework developed by NREL. -
Federal
StingRAY Structural Optimization Final Technical Report recent views
Department of Energy —
The overall project objective is to materially decrease the leveled cost of energy (LCOE) of the Columbia Power (CPower) StingRAY utility-scale wave energy converter... -
Federal
StingRAY Failure Mode, Effects and Criticality Analysis: WEC Risk Registers recent views
Department of Energy —
Analysis method to systematically identify all potential failure modes and their effects on the Stingray WEC system. This analysis is incorporated early in the... -
Federal
StingRAY H1 Humboldt Cost Breakdown Structure recent views
Department of Energy —
Columbia Power LCOE (levelized cost of energy) Model for the Stingray H1 at the DOE Reference Site of Humboldt, CA. The model is integrated with and reports LCOE from... -
Federal
LandRAY PTO Testing Utilizing the NREL NWTC 5MW Dynamometer recent views
Department of Energy —
The overarching project objective is to demonstrate the feasibility of using an innovative PowerTake-Off (PTO) Module in Columbia Power's utility-scale wave energy... -
Federal
StingRAY System and LCOE Content Models recent views
Department of Energy —
DOE System and LCOE (levelized costs of energy) Content Models completed for a utility-scale Stingray WEC. -
Federal
StingRAY Updated WEC Risk Registers recent views
Department of Energy —
Updated Risk Registers for major subsystems of the StingRAY WEC completed according to the methodology described in compliance with the DOE Risk Management Framework...