-
Federal
Figure 5. Upper Soldier Creek, KS predicted daily total phosphorus loads normalized for year of average precipitation adjusted for climate change (2021 – 2050) based on GISS-E2-H change scenario for RCP4.5 with optimized management solutions for 2014
U.S. Environmental Protection Agency —
Data underlying Figure 5. Upper Soldier Creek, KS predicted daily total phosphorus loads normalized for year of average precipitation adjusted for climate change... -
Federal
Table 2. SWAT Model Calibration for Soldier Creek, Subbasins 1-7.
U.S. Environmental Protection Agency —
Table 2. SWAT Model Calibration for Soldier Creek, KS. Subbasins 1-7. Variable_n refers to calibration results for subbasin n, from 1 (headwaters of Upper Soldier... -
Federal
Figure 4. Upper Soldier Creek Climate Scenario Summary. RCP4.5 scenarios for total phosphorus loads for 2021-2050 time frame as compared to 2014 baseline.
U.S. Environmental Protection Agency —
Figure 4 data set. Upper Soldier Creek Climate Scenario Summary. RCP4.5 scenarios for 2021-2050 time frame as compared to 2014 baseline. Simulations were run with an... -
Federal
RBEROSTv1 Dataset for Upper Connecticut River Pilot Project
U.S. Environmental Protection Agency —
This database contains data required to run the River Basin Export Reduction Optimization Support Tool (RBEROST) v1 for the pilot study in the Upper Connecticut River... -
Federal
RBEROSTv1 Dataset for Upper Connecticut River Pilot Project
U.S. Environmental Protection Agency —
This database contains data required to run the River Basin Export Reduction Optimization Support Tool (RBEROST) v1 for the pilot study in the Upper Connecticut River...