-
Federal
Utah FORGE: Drilling Data for Student Competition
Department of Energy —
Diagnostic drilling data (Pason log files) from Well 58-32 (previously labeled MU-ESW1), which was drilled near Milford Utah during Phase 2B of the FORGE Project to... -
Federal
Microhole drilling technology utilizing a golden section search algorithm
Department of Energy —
A fundamental issue in microhole drilling is that delivering high weight-on-bit (WOB), high torque rotational horsepower to a conventional drill bit does not scale... -
Federal
Practices Maintain Straight Hole in Crooked Hole Conditions, While Also Enabling Significant Gains in Drill Rate
Department of Energy —
Bottom hole assembly (BHA) designs were assessed in field trials for their ability to achieve critical low inclination requirements, while simultaneously enabling...