Federal
StingRAY Structural Optimization Final Technical Report Appendices
Department of Energy —
The protected data appendices to the public Final Technical Report. The overall project objective is to materially decrease the leveled cost of energy (LCOE) of the... -
Federal
StingRAY Structural Optimization Final Technical Report
Department of Energy —
The overall project objective is to materially decrease the leveled cost of energy (LCOE) of the Columbia Power (CPower) StingRAY utility-scale wave energy converter... -
Federal
StingRAY Updated WEC Risk Registers
Department of Energy —
Updated Risk Registers for major subsystems of the StingRAY WEC completed according to the methodology described in compliance with the DOE Risk Management Framework... -
Federal
Triton-C WEC Installation, Operations and Maintenance Plan (DDP)
Department of Energy —
This is the Installation, Operations and Maintenance (IO&M) Plan for the Triton-C WEC based on the Detailed System Design Package (DDP), including a report and... -
Federal
StingRAY Failure Mode, Effects and Criticality Analysis: WEC Risk Registers
Department of Energy —
Analysis method to systematically identify all potential failure modes and their effects on the Stingray WEC system. This analysis is incorporated early in the... -
Federal
Triton-C Point Absorber Preliminary System Design Package
Department of Energy —
Preliminary System Design Package for the Triton-C WEC, including a report and CAD drawings pertaining to the overall preliminary design, system arrangement, surface... -
Federal
Triton-C WEC Fabrication Plan (DDP)
Department of Energy —
This is the Fabrication Plan for the Triton-C WEC based on the Detailed System Design Package (DDP), including a report and visuals pertaining to the overall detailed...