Search datasets
-
Diagnostic drilling data (Pason log files) from Well 58-32 (previously labeled MU-ESW1), which was drilled near Milford Utah during Phase 2B of the FORGE Project to confirm geothermal reservoir...
Search relevance: 1.00 | Views last month: 19 | Catalog Last Checked: August 03, 2026 at 01:00 AM -
A fundamental issue in microhole drilling is that delivering high weight-on-bit (WOB), high torque rotational horsepower to a conventional drill bit does not scale down to the hole sizes necessary...
Search relevance: 1.00 | Views last month: 5 | Catalog Last Checked: August 03, 2026 at 01:01 AM -
Bottom hole assembly (BHA) designs were assessed in field trials for their ability to achieve critical low inclination requirements, while simultaneously enabling high drill rates. Because angle...
Search relevance: 1.00 | Views last month: 2 | Catalog Last Checked: August 03, 2026 at 12:57 AM