Search datasets
-
Risk Registers for major subsystems of the StingRAY WEC completed in compliance with the DOE Risk Management Framework developed by NREL.
Search relevance: 1.00 | Views last month: 4 | Catalog Last Checked: September 10, 2026 at 05:51 PM -
Analysis method to systematically identify all potential failure modes and their effects on the Stingray WEC system. This analysis is incorporated early in the development cycle such that the...
Search relevance: 1.00 | Views last month: 4 | Catalog Last Checked: September 10, 2026 at 05:51 PM -
Columbia Power LCOE (levelized cost of energy) Model for the Stingray H1 at the DOE Reference Site of Humboldt, CA. The model is integrated with and reports LCOE from DOE Cost Breakdown Structure
Search relevance: 1.00 | Views last month: 1 | Catalog Last Checked: September 10, 2026 at 05:51 PM -
DOE System and LCOE (levelized costs of energy) Content Models completed for a utility-scale Stingray WEC.
Search relevance: 1.00 | Views last month: 1 | Catalog Last Checked: September 10, 2026 at 05:51 PM -
Updated Risk Registers for major subsystems of the StingRAY WEC completed according to the methodology described in compliance with the DOE Risk Management Framework developed by NREL.
Search relevance: 1.00 | Views last month: 1 | Catalog Last Checked: September 10, 2026 at 05:51 PM -
Tape 1 segment 1 of the 3-Chip camera taken during the JSL2 dive number 4371 in the Monitor National Marine Sanctuary leg of the South Atlantic Bight Mission in the Islands in the Stream...
Search relevance: 1.00 | Views last month: 0 | Catalog Last Checked: August 25, 2026 at 10:53 PM -
The overarching project objective is to demonstrate the feasibility of using an innovative PowerTake-Off (PTO) Module in Columbia Power's utility-scale wave energy converter (WEC). The PTO Module...
Search relevance: 1.00 | Views last month: 0 | Catalog Last Checked: September 10, 2026 at 05:51 PM