Found 7 datasets matching filters.
-
The project objectives for CalWave's deployment at PacWave are distinguished by the Preliminary Design Phase and the Detailed Design Phase. During the Preliminary Design Phase, the Risk Register...
Search relevance: 1.00 | Views last month: 4 | Catalog Last Checked: March 23, 2026 at 09:43 PM -
The goal of this Project was to develop a standards-compliant, fabrication-ready design of Columbia Power Technologies' (C-Power) next-generation wave energy converter (WEC), the StingRAY H3. The...
Search relevance: 1.00 | Views last month: 0 | Catalog Last Checked: March 23, 2026 at 09:42 PM -
Risk Register for the RivGen power system, optimized for performance, durability and survivability, in Microsoft Excel format.
Search relevance: 1.00 | Views last month: 0 | Catalog Last Checked: March 23, 2026 at 09:42 PM -
Analysis method to systematically identify all potential failure modes and their effects on the Stingray WEC system. This analysis is incorporated early in the development cycle such that the...
Search relevance: 1.00 | Views last month: 0 | Catalog Last Checked: March 23, 2026 at 09:42 PM -
Risk Registers for major subsystems completed according to the methodology described in the Risk Management Plan [DE-EE0008627 D1.2 Risk Management Plan PD v1.1 07-19-2019.pdf], also included here.
Search relevance: 1.00 | Views last month: 0 | Catalog Last Checked: March 23, 2026 at 09:42 PM -
Updated Risk Registers for major subsystems of the StingRAY WEC completed according to the methodology described in compliance with the DOE Risk Management Framework developed by NREL.
Search relevance: 1.00 | Views last month: 0 | Catalog Last Checked: March 23, 2026 at 09:42 PM