{"accessLevel": "public", "accrualPeriodicity": "irregular", "bureauCode": ["010:10"], "contactPoint": {"@type": "vcard:Contact", "fn": "RISE Team", "hasEmail": "mailto:data@usbr.gov"}, "description": "This document contains the final report appendices including: monitoring equipment installation history, contractor grade control structure installation report, photographs of grade control structure installations, and references to datasets.", "distribution": [{"@type": "dcat:Distribution", "accessURL": "https://data.usbr.gov/catalog/4414/item/10720", "description": "Landing page for \"Report Appendices for S&T Project Number 1751: Impacts of Grade Control Structure Installations on Hydrology and Sediment Transport as an Adaptive Management Strategy\"", "mediaType": "text/html", "title": "RISE Item Details Page URL for \"Report Appendices for S&T Project Number 1751: Impacts of Grade Control Structure Installations on Hydrology and Sediment Transport as an Adaptive Management Strategy\""}, {"@type": "dcat:Distribution", "description": "\"Report Appendices for S&T Project Number 1751: Impacts of Grade Control Structure Installations on Hydrology and Sediment Transport as an Adaptive Management Strategy\" as a PDF file", "downloadURL": "https://data.usbr.gov/rise/content-rise-public/rise/catalog-item/binary/Appendices%20complete%20508.pdf", "mediaType": "application/pdf", "title": "PDF File for \"Report Appendices for S&T Project Number 1751: Impacts of Grade Control Structure Installations on Hydrology and Sediment Transport as an Adaptive Management Strategy\""}], "identifier": "https://datainventory.usbr.gov/rise/item/10720", "keyword": ["Check Dams", "Ecoclimate", "Ecohydrology", "Erosion", "Erosion Control Structures", "Grade Control Structures", "Green Infrastructure", "Low Impact Development", "Non-Structural Stormwater Management", "One Rock Dam", "Sediment Transport", "Stormwater", "Urban Heat", "Water Modeling"], "landingPage": "https://data.usbr.gov/catalog/4414/item/10720", "modified": "2020-12-18T15:55:39Z", "publisher": {"@type": "org:Organization", "name": "Bureau of Reclamation"}, "spatial": "{\"type\":\"Polygon\",\"coordinates\":[[[-112.04006,33.36488],[-112.04188,33.36296],[-112.04031,33.36086],[-112.04017,33.36322],[-112.03912,33.36494],[-112.04006,33.36488]]]}", "title": "Report Appendices for S&T Project Number 1751: Impacts of Grade Control Structure Installations on Hydrology and Sediment Transport as an Adaptive Management Strategy"}