{"accessLevel": "public", "accrualPeriodicity": "irregular", "bureauCode": ["010:10"], "contactPoint": {"@type": "vcard:Contact", "fn": "RISE Team", "hasEmail": "mailto:data@usbr.gov"}, "description": "We developed a novel three-tiered approach to quantify and spatially represent zones of\r\nsediment erosion, bedrock erosion, and subsequent sediment deposition associated with a range\r\nof flow events on an unlined spillway at New Melones Dam, located approximately 45 miles\r\nnortheast of Modesto, California. Our three-tiered approach includes the application of: (1) the\r\nSedimentation and River Hydraulics two-dimensional (SRH-2D) sediment transport model to\r\ninform sediment removal and deposition; (2) a two-dimensional (2D) probabilistic erosion model\r\nusing the Annandale Erodibility Index Method (Annandale, 1995) to inform the potential for\r\nbedrock erosion across the full spatial extent of the spillway; and (3) the Hurst one-dimensional\r\n(1D) Erosion model (H1DE), a 1D bedrock incision model (Hurst et al., 2021), to inform the\r\ntiming and magnitude of vertical incision into bedrock and the potential for knickpoint (headcut)\r\npropagation.", "distribution": [{"@type": "dcat:Distribution", "accessURL": "https://data.usbr.gov/catalog/7983/item/128539", "description": "Landing page for \"ENV-2023-045 A Three-Tiered Approach to Assess Erosion and Deposition on and Downstream from New Melones Dam's Auxiliary Spillway Final Report\"", "mediaType": "text/html", "title": "RISE Item Details Page URL for \"ENV-2023-045 A Three-Tiered Approach to Assess Erosion and Deposition on and Downstream from New Melones Dam's Auxiliary Spillway Final Report\""}, {"@type": "dcat:Distribution", "description": "\"ENV-2023-045 A Three-Tiered Approach to Assess Erosion and Deposition on and Downstream from New Melones Dam's Auxiliary Spillway Final Report\" as a PDF file", "downloadURL": "https://data.usbr.gov/rise/content-rise-public/rise/catalog-item/binary/NewMelones%20Report_ENV-2023-045_FINAL_110123%20%281%29.pdf", "mediaType": "application/pdf", "title": "PDF File for \"ENV-2023-045 A Three-Tiered Approach to Assess Erosion and Deposition on and Downstream from New Melones Dam's Auxiliary Spillway Final Report\""}], "identifier": "https://datainventory.usbr.gov/rise/item/128539", "keyword": ["Dam Safety", "Erosion", "Spillway"], "landingPage": "https://data.usbr.gov/catalog/7983/item/128539", "modified": "2025-11-19T21:09:06Z", "publisher": {"@type": "org:Organization", "name": "Bureau of Reclamation"}, "spatial": "{\"type\":\"Point\",\"coordinates\":[-120.525,37.9481]}", "title": "ENV-2023-045 A Three-Tiered Approach to Assess Erosion and Deposition on and Downstream from New Melones Dam's Auxiliary Spillway Final Report"}