-
Federal
Event-correlated Outage Dataset in America
Department of Energy —
This dataset includes an aggregated and event-correlated analysis of power outages in the United States, synthesized by integrating three data sources: the... -
State
MTA Key Performance Indicators: 2008-2021
State of New York —
This dataset combines Key Performance Indicator data that was reported starting with the creation of the MTA Stat performance metric dashboard in 2008 through 2021.... -
State
MTA Subway Trains Delayed: Beginning 2020
State of New York —
This dataset shows the number of subway trains delayed per day type (weekdays and weekends) in a month, broken down into specific delay categories. -
State
MTA Subway Terminal On-Time Performance: 2020-2024
State of New York —
Terminal On-Time Performance measures the percentage of trains arriving at their destination terminals as scheduled. -
Federal
NIST/SEMATECH e-Handbook of Statistical Methods (NIST Handbook 151)
National Institute of Standards and Technology —
The NIST/SEMATECH e-Handbook of Statistical Methods is a Web-based book written to help scientists and engineers incorporate statistical methods into their work as... -
State
MTA Subway Major Incidents: Beginning 2025
State of New York —
Major Incidents are unplanned incidents that delay 50 or more trains, which cause the most disruption to customers. -
State
MTA Subway Delay-Causing Incidents: Beginning 2020
State of New York —
This dataset presents the number of subway incidents that caused train delays, broken down by line, day type (weekday/weekend), and specific delay category and... -
State
MTA LIRR Major Incidents: Beginning 2020
State of New York —
This dataset is of major incidents on the LIRR, which are defined as events that lead to ten or more trains that are delayed by more than 5 minutes 59 seconds,... -
State
MTA Subway Customer Journey-Focused Metrics: 2020-2024
State of New York —
Additional Platform Time (APT) is the estimated average extra time that customers spend waiting on the platform for a train, compared with their scheduled wait time.... -
State
MTA LIRR Delay Verification: Beginning 2010
State of New York —
This dataset lists all LIRR trains that are delayed, with information on whether a train is cancelled, partially cancelled, or late (in a rounded number of minutes),... -
State
MTA Bus Wait Assessment: 2020 - 2024
State of New York —
Wait Assessment measures how evenly buses are spaced. Additional years of data are available in separate datasets on data.ny.gov. -
Federal
Triton-C WEC Installation, Operations and Maintenance Plan (DDP)
Department of Energy —
This is the Installation, Operations and Maintenance (IO&M) Plan for the Triton-C WEC based on the Detailed System Design Package (DDP), including a report and... -
State
MTA Bus Customer Journey-Focused Metrics: 2020 - 2024
State of New York —
Additional Bus Stop Time is the average time that customers spend waiting at a stop beyond their scheduled wait time. Additional Travel Time is the average time... -
Federal
2014 Wind Turbine Gearbox Damage Distribution based on the NREL Gearbox Reliability Database
Department of Energy —
Despite the improvements in wind turbine gearbox design and manufacturing practices, the wind industry is still challenged by premature wind turbine gearbox failures.... -
State
MTA NYCT Paratransit Ride Time: Beginning 2017
State of New York —
Ride Time measures customer trip duration. Actual vs. Scheduled presents travel time variance, Average Travel Time presents the average actual trip duration, and Max... -
Federal
NIST-CSF-to-NERC-CIP-OLIR-Mapping Informative Reference Details
National Institute of Standards and Technology —
The purpose of this mapping is to provide the relationship between NIST Cybersecurity Framework (CSF) v1.1 and the NERC Critical Infrastructure Protection (CIP)... -
State
MTA NYCT Paratransit Provider No-Shows: Beginning 2016
State of New York —
This metric measures the frequency with which primary providers do not arrive at the pick-up location within 30 minutes of the promised time and the trip is not... -
State
MTA Subway Terminal On-Time Performance: Beginning 2025
State of New York —
Terminal On-Time Performance measures the percentage of trains arriving at their destination terminals as scheduled. -
State
MTA NYCT Paratransit Max Ride Time Performance: 2018 - 2023
State of New York —
Max Ride Time Performance presents the percentage of trips performed with Access-A-Ride’s established max ride time standards between 2018 and 2023. This dataset is... -
Federal
Next Generation RivGen Power System: Risk Register
Department of Energy —
Risk Register for the RivGen power system, optimized for performance, durability and survivability, in Microsoft Excel format.