Soil Logs, grain size analysis, and water quality measurements at West Fork Hoquiam River Dam Removal and Groundwater Replacement Preliminary Design and Permitting project from 2024-04-29 to 2024-10-15 (NCEI Accession 0306762)
National Oceanic and Atmospheric Administration, Department of Commerce —
Drilling of the exploratory boreholes and installation of the monitoring well was completed by Anderson Environmental Contracting, LLC (AEC), using sonic drilling... -
Federal
Soil logs and grain size analysis from three sonic borings as part of the West Fork of the Hoquiam River Dam Removal and Groundwater Replacement Preliminary Design and Permitting project from 2023-06-19 to 2023-06-29 (NCEI Accession 0302303)
National Oceanic and Atmospheric Administration, Department of Commerce —
Drilling of the exploratory boreholes and installation of the monitoring well was completed by Anderson Environmental Contracting, LLC (AEC), using sonic drilling... -
Federal
Water Head and Groundwater Levels at West Fork Hoquiam River Dam Removal and Groundwater Replacement Preliminary Design and Permitting project from 2024-04-29 to 2024-08-10 (NCEI Accession 0306765)
National Oceanic and Atmospheric Administration, Department of Commerce —
Following installation of Monitoring Wells in 2024, each well was equipped with a data logger to document groundwater levels at the site during. Water levels included...